Mobile Soil Washing Plant: The Complete Guide to On-Site Remediation

  • Jul 10.
  • Editorial Team.
  • 0 visits
Desen Environment's mobile soil washing plant delivers on-site remediation with 10–15 t/h capacity and 90% water recycling. Trailer-mounted integrated design deploys in 1–3 days for contaminated site treatment.

When industrial sites require urgent soil remediation, time and mobility are critical factors. Desen Environment's mobile soil washing plant — China's first fully truck-mounted integrated remediation system — brings complete treatment capability directly to the contaminated site, eliminating the need for costly soil transportation and off-site processing.

All-in-One Mobile Design

Unlike stationary remediation plants that require months of construction, the mobile soil washing plant integrates feeding, screening, scrubbing, solid-liquid separation, and wastewater treatment onto a standardized trailer platform. Deployment takes just 1–3 days, and the system can be relocated within hours — ideal for multi-site projects and emergency spill response.

Technical Specifications That Matter

  • Processing capacity: 10–15 tons per hour per mobile unit

  • Total power requirement: 300 kW with integrated diesel-electric option

  • Footprint: approximately 1,200 m² (40m × 30m courtyard layout)

  • Water recycling rate: ≥90% through closed-loop treatment system

  • Crew requirement: only 2–3 operators per shift

Proven Results Across Multiple Contaminant Types

The mobile washing plant effectively treats heavy metals (lead, cadmium, chromium, zinc), petroleum hydrocarbons, and organic pollutants in soils from chemical plants, smelters, mining sites, and oil fields. Its modular vehicle configuration — Mobile Scrubbing Vehicle, Mobile Classification Vehicle, Mobile Filter Press Vehicle, and Mobile Water Treatment Vehicle — allows flexible deployment based on site needs.

With over 100 completed remediation projects across China and the Middle East, Desen's mobile leaching equipment has proven itself as a reliable solution for urban brownfield redevelopment, industrial site cleanup, and emergency contamination events. The DCS intelligent control system with 5G IoT ensures operators can monitor and adjust treatment parameters remotely, maximizing both efficiency and compliance.

For project managers seeking a fast-deployment mobile soil remediation system for sale, Desen Environment offers comprehensive after-sales support including on-site training, spare parts supply, and technical consultation.

Share:
Tags:

To start your project with us

Contact our experts
WhatsApp Scan
Learn More